First up was to remove over 300 rawl plugs from the walls and fill the resulting holes. Followed by rubbing down the walls and woodwork where required.
Next up on the preparation side was caulking and filling other gaps and holes before the painting could begin.
Finally, priming and undercoating woodwork, adding a mist coat to some newly plastered walls and then finishing with top coats of Dulux Trade Emulsion and Masonry paint where applicable..
Do you have a commercial painting and decorating project in Northamptonshire, Buckinghamshire, Bedfordshire or Oxfordshire?